Monitoring Contaminated Flow |
|
Waterloo Systems comprised entirely of stainless steel casing, packers and ports with Teflon-lined tubing were used to monitor contaminant flow in this bedrock application. |
|
Detailed investigation of PCE delineation in carbonate bedrock. A cost analysis of the 14 Waterloo Systems compared with nested piezometers indicated savings both on the capital costs and on the on-going monitoring. |
|
Installation at 700 ft. |
|
Contaminant investigation at a U.S. Air Force Base. Waterloo Systems installed to 700 ft. in overburden using screened and cased wells. Up to 6 zones per hole with dedicated pumps and transducers. |
|
An EPA regulated site in Northeast, USA. This multilevel array allowed a sampling team to purge and sample from 40 monitoring zones across 10 borehole locations in just 4 days. These Waterloo Systems were installed in overburden using preinstalled casing. |