 |
CMT Multilevel System Pre-installation Requirements
Please complete this form to verify that proper consideration has been given to design and borehole specifications for each CMT Multilevel System to be installed. (CMT tubing 1.7 OD, Guide Point Port 1.75 OD, Guide Point Port with Anchor 3.75 OD).
 |
1/
|
Minimum information required for effective design of the CMT Multilevel System:
|
Accurate borehole depth
___________________________________________
Borehole Angle
___________________________________________
Depth to which CMT System is to be installed
___________________________________________
Borehole geology
___________________________________________
___________________________________________
Casing size (minimum ID)
___________________________________________
Depth to base of well casing
___________________________________________
Number of Monitoring Zones
___________________________________________
___________________________________________
Expected Maximum Pressure Heads at each Port location
___________________________________________
Site Conditions (eg. dry field, bush, swamp, paved, etc.)
___________________________________________
Any special surface requirements for completion of installation (eg. flush mounted, angled, etc)
___________________________________________
|
 |