Content on this page requires a newer version of Adobe Flash Player.
Home
Products
Contact Us
About
Downloads
Papers & Info
Tradeshows
Español
Links
News
Content on this page requires a newer version of Adobe Flash Player.
CMT Multilevel System Assembly Manual
Quote
|
Info
|
Software
|
Download Assembly Manual (PDF)
Table of Contents
CMT Multilevel
System Assembly Manual
Pre Installation Requirements
Introduction
Preparation
Assembling Standard CMT Systems
Marking and Cutting the Tubing
Cutting Outer Ports and Vent Holes
Configuring Tubing Bottom
Attaching Tubing Centralizers
CMT Placement
Attaching Standard Wellhead
Monitoring Options
Download PDF (696kb)
View Complete Table of Contents
Related Documents
Narrow CMT Multilevel
System Assembly Manual
Purge/Grout Adaptor
Operating Instructions
Summary of Drilling
Methods & Techniques
FAQ
Related Products
Model 401
Waterloo Multilevel System
Model 660
Drive-Point Profiler
Model 103
Tag Line
Complete Table of Contents
CMT Multilevel System Pre-installation Requirements
a)
Minimum information required for effective design of the CMT Multilevel System
b)
Ensure that these additional items are available on site during installation
Introduction
Preparation
Assembling Standard CMT Multilevel Systems
Marking and Cutting the Tubing
Step 1)
Uncoil Tubing
Step 2)
Indicate Ground Surface on Tubing
Step 3)
Locate Channel 1 Identifier
Step 4)
Mark Monitoring Port 1
Step 5)
Mark Port 1 for Port Cutting Guide
Step 6)
Mark all Ports and Cut Tubing at Deepest Port
Step 7)
Complete Design
top
Cutting the Outer Ports and Vent Holes
Step 8)
Install the Port Cutting Guide
Step 9)
Use Cutting Bolts to Cut Holes
Step 10)
Cut Panel Between Upper Two Port Holes
Step 11)
Insert Expansion Plug
Step 12)
Install the Well Screen
Installing Oetiker Clamps
Step 13)
Line-up Port Cutting Guide
Step 14)
Create Port 2 Opening
Step 15)
Finish Constructing Port 2
Step 16)
Construct Ports 3 to 6
Configuring the Bottom of the CMT Tubing (Zone 7)
Step 17)
Insert Expansion Plugs
Step 18)
Attach the Guide Point Port
Step 19)
Install an Anchor
Attaching Tubing Centralizers
Step 20)
Install Centralizers
CMT Placement
Step 21)
Lower the CMT System
Step 22)
Complete the Well Installation
Attaching the Standard Wellhead
Step 23)
Attach the Wellhead
top
Optional Flow Control Monitoring Assembly
Monitoring Options
Water Level Measurement
Well Completion
Sampling Methods
top