|
|

Pump Operation
Portable: |
The Pump will be attached to skip-bonded, dual 1/4" OD LDPE tubing, mounted on a reel. |
- Slip the double ear Oetiker clamps onto the drive and sample stems on the DVP. Push drive and sample tubing onto the stems and crimp both ears on each clamp to secure the tubing.
- Lower the assembled DVP into the well.
- Connect the supply line with the in-line dryer from the compressed gas source to the Control Unit. The drive line connects from the Control Unit to the reel.
- Attach a short (3 ft. or 1 m) length of 1/4" OD sample line to the sample connector on the reel.
Dedicated: |
The Pump will come with a roll of tubing to be cut to length, as required, for connection to a Wellhead. |
- Cut the tubing to desired length. Slip the double ear Oetiker clamps onto the drive and sample stems on the DVP. Push drive and sample tubing onto the stems and crimp both ears on each clamp to secure the tubing.
- Attach the sample and drive lines to the appropriate Push Fittings on the underside of the Wellhead. (See diagram at right for use of Push Fittings).
- Lower the DVP into the well. Push the Wellhead firmly onto the riser casing.
- Attach a short (3 ft. or 1 m) length of 1/4" OD sample line to the sample line adaptor on the Wellhead.
- Connect the supply line with the in-line dryer from the compressed gas supply to the Control Unit. The drive line connects from the Control Unit to the top of the Wellhead.
- For detailed pumping instructions, please see the Solinst Model 466 Control Unit Operating Instructions.
Notes: |
- The maximum lift for stainless steel (SS) pumps is 500 ft. (150 m)
- DO NOT exceed an operating pressure of 250 psi
- The pump has been decontaminated before leaving Solinst however, you may wish to decontaminate your pump before use. The pump should be decontaminated between wells.
- Refer to the operating instructions in the lid of the Solinst Model 466 Control Unit for detailed pumping instructions.
|

® Solinst is a registered trademark of Solinst Canada Ltd.
|