Tag: 401 waterloo multilevel system

High-Resolution Site Characterization With Multilevel Systems

Within the last few years, the U.S. EPA added a new focus area on high-resolution site characterization (HRSC) to their Contaminated Site Clean-Up Information (CLU-IN) website. The U.S. EPA’s definition of HRSC is: “High-resolution site characterization (HRSC) strategies and techniques use scale-appropriate measurement and sample density to define contaminant distributions, and the physical context in… Continue Reading »

Comparing Multilevel Systems

The CMT System (Since 1999) CMT offers in-field design flexibility, low cost and is easy to install. The number of monitoring ports, port locations, install depths, and monitoring strategy, can all be accommodated and designed right in the field. The single tube offers effective sealing.The 7-Channel is 1.7″ (43 mm) and the 3-Channel is 1.1″… Continue Reading »