Installation within Wellscreen / CasingA permanent 3 or 4 casing and screen string can be installed by a drilling contractor using typical sand and bentonite placement methods. Then a Waterloo System with either permanent or removable packers can be installed within the screen and casing string, as in a bedrock borehole.Installs QuicklyInstallation of the Waterloo System is quick and easy. Starting with the base plug and lowermost sections, the components are joined together in the order required. As each new port is put into position a new monitoring tube, dedicated pump and/or transducer is connected to it. Successive components are threaded over these tubes, building the casing string, until the System is complete.Typically, installations are completed in a day, using a 3-4 member team. Depending on the depth, a drill rig may be required. Solinst can provide training for system installation and operation.
|