Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Home Products Contact Us About Downloads Papers & Info Tradeshows Español Links News

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Waterloo System

Model 401 Waterloo Multilevel Systems

Installation within Wellscreen / Casing

A permanent 3” or 4” casing and screen string can be installed by a drilling contractor using typical sand and bentonite placement methods. Then a Waterloo System with either permanent or removable packers can be installed within the screen and casing string, as in a bedrock borehole.

Installs Quickly

Installation of the Waterloo System is quick and easy. Starting with the base plug and lowermost sections, the components are joined together in the order required. As each new port is put into position a new monitoring tube, dedicated pump and/or transducer is connected to it. Successive components are threaded over these tubes, building the casing string, until the System is complete.

Typically, installations are completed in a day, using a 3-4 member team. Depending on the depth, a drill rig may be required. Solinst can provide training for system installation and operation.

 

 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player